TRF2443EVM

Mfr. #: TRF2443EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR TRF2443-445
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TRF2443EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF2443EVM Overview

Compatible with TRF2443. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Transceiver Bulk is the packaging method for this product This product's 340MHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This product is an Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications. This tool is designed for the TRF2443. USB interface type

TRF2443EVM Image

TRF2443EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF2443EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF2443
  • Series -
  • Product Evaluation Modules
  • Type Transceiver
  • Packaging Bulk
  • Frequency 340MHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications
  • Tool-Is-For-Evaluation-Of TRF2443
  • Interface-Type USB

TRF2443EVM

TRF2443EVM Specifications

TRF2443EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF2443.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Transceiver.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 340MHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF2443.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$560.79
US$560.79
10
US$532.75
US$5 327.50
100
US$504.71
US$50 471.10
500
US$476.67
US$238 335.75
1000
US$448.63
US$448 632.00
Top