TSC2003EVM-PDK

Mfr. #: TSC2003EVM-PDK
제조사: Texas Instruments
설명: Sensor Development Tools Touch Sensor Development Tools TSC2003-PDK Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TSC2003EVM-PDK 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2003EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: - IC package type: TSC2003 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2003.

TSC2003EVM-PDK Image

TSC2003EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2003EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TSC2003
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2003

TSC2003EVM-PDK

TSC2003EVM-PDK Specifications

TSC2003EVM-PDK FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Resistive Touch Sensors

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TSC2003.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2003

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top