TSC2007EVM

Mfr. #: TSC2007EVM
제조사: Texas Instruments
설명: TSC2007EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TSC2007EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed USB-MODEVM amplifier. Sensitivity: - Interface: I2C Voltage Supply Range: - Touch Screen Sensing range of - Included item: Board. IC package type: TSC2007 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2007. 4-Wire USB interface type

TSC2007EVM Image

TSC2007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With USB-MODEVM
  • Sensitivity -
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Touch Screen
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TSC2007
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2007
  • Interface-Type 4-Wire USB

TSC2007EVM

TSC2007EVM Specifications

TSC2007EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is USB-MODEVM.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Touch Screen

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TSC2007.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TSC2007.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is 4-Wire USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top