TSC2046EVM

Mfr. #: TSC2046EVM
제조사: Texas Instruments
설명: Sensor Development Tools Touch Sensor Development Tools TSC2046 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TSC2046EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2046EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, SPI Interface IC package type: TSC2046 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2046.

TSC2046EVM Image

TSC2046EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2046EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, SPI Interface
  • Embedded No
  • Utilized-IC-Part TSC2046
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2046

TSC2046EVM

TSC2046EVM Specifications

TSC2046EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Resistive Touch Sensors

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Touch Screen Controller.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, SPI Interface.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2046.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TSC2046.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$9.42
US$9.42
10
US$8.95
US$89.49
100
US$8.48
US$847.80
500
US$8.01
US$4 003.50
1000
US$7.54
US$7 536.00
Top