Product belongs to the - series. This product is categorized as Evaluation Kits Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2111 This product operates at a 2.7 V supply voltage for reliable performance. This tool is designed for the TSC2111.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2111EVM-PDK Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Kits.
A: What is the Type of the product?
Q: The Type of the product is Resistive Touch Sensors.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Interface, Touch Screen Controller.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TSC2111.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 2.7 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TSC2111.