TSC2301EVM

Mfr. #: TSC2301EVM
제조사: Texas Instruments
설명: Sensor Development Tools Touch Sensor Development Tools TSC2301 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TSC2301EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2301EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: - IC package type: TSC2301 This product operates at a 6 V to 12 V supply voltage for reliable performance. This tool is designed for the TSC2301.

TSC2301EVM Image

TSC2301EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2301EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TSC2301
  • Operating-Supply-Voltage 6 V to 12 V
  • Tool-Is-For-Evaluation-Of TSC2301

TSC2301EVM

TSC2301EVM Specifications

TSC2301EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Resistive Touch Sensors.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Touch Screen Controller.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2301

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 6 V to 12 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2301

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top