UCC25230EVM-662

Mfr. #: UCC25230EVM-662
제조사: Texas Instruments
설명: EVAL MODULE FOR UCC25230-662
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCC25230EVM-662 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25230EVM-662 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators The DC/DC, Step Down is the Main-Purpose. 36 V ~ 72 V voltage input This product features 'Frequency-Switching' at 200kHz for optimal performance. Output voltage: 3.3V Buck regulator topology 100W Included item: Board. IC package type: UCC25230, UCC28250 Board type: Fully Populated. The product has 1, Isolated outputs. Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C Output voltage: 9 V This tool is designed for the UCC25230. Input Voltage Range: 12 V to 100 V Output current: 200 mA

UCC25230EVM-662 Image

UCC25230EVM-662

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25230EVM-662 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 36 V ~ 72 V
  • Frequency-Switching 200kHz
  • Current-Output 30A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output 100W
  • Supplied-Contents Board
  • Utilized-IC-Part UCC25230, UCC28250
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Isolated
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage 9 V
  • Tool-Is-For-Evaluation-Of UCC25230
  • Input-Voltage 12 V to 100 V
  • Output-Current 200 mA

UCC25230EVM-662

UCC25230EVM-662 Specifications

UCC25230EVM-662 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 36 V ~ 72 V

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 200kHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed 100W

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is UCC25230, UCC28250.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Isolated.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 9 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is UCC25230.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 12 V to 100 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 200 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top