UCC25230EVM-754

Mfr. #: UCC25230EVM-754
제조사: Texas Instruments
설명: EVAL MODULE FOR UCC25230-754
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCC25230EVM-754 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25230EVM-754 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators The DC/DC, Step Down is the Main-Purpose. 36 V ~ 72 V voltage input This product features 'Frequency-Switching' at 380kHz for optimal performance. Output voltage: 12V, 12V Buck regulator topology 1.5W Included item: Board. IC package type: UCC25230 Board type: Fully Populated. The product has 1, Isolated; 1, Non-Isolated outputs. Output voltage: 8.5 V to 12.5 V This tool is designed for the UCC25230. Input Voltage Range: 36 V to 72 V Output current: 65 mA

UCC25230EVM-754 Image

UCC25230EVM-754

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25230EVM-754 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 36 V ~ 72 V
  • Frequency-Switching 380kHz
  • Current-Output 65mA
  • Voltage-Output 12V, 12V
  • Regulator-Topology Buck
  • Power-Output 1.5W
  • Supplied-Contents Board
  • Utilized-IC-Part UCC25230
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Isolated; 1, Non-Isolated
  • Output-Voltage 8.5 V to 12.5 V
  • Tool-Is-For-Evaluation-Of UCC25230
  • Input-Voltage 36 V to 72 V
  • Output-Current 65 mA

UCC25230EVM-754

UCC25230EVM-754 Specifications

UCC25230EVM-754 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 36 V ~ 72 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 380kHz.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 12V, 12V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed 1.5W

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is UCC25230.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Isolated; 1, Non-Isolated

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 8.5 V to 12.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is UCC25230.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 36 V to 72 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 65 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top